A new section of Strawberry Line from Westbury-sub-Mendip to Easton
I cycled over to Westbury-sub-Mendip on a grizzly, but almost dry, day to witness the opening of this new bit of the Line. Although it is only a mile long, it is an amazing section to have been completed.
It replaces, from a cyclist / walker point-of-view a horrible narrow bit of the busy A371.
It links the residents of Westbury-sub-Mendip and Easton. Previously they would almost certainly have not bothered (or driven).
It involved a lot of expenditure including reinforcing the bridge under the A371 and building a new farm-access bridge.
I cycled over to Westbury-sub-Mendip on a grizzly, but almost dry, day to witness the opening of this new bit of the Line. Although it is only a mile long, it is an amazing section to have been completed.
It replaces, from a cyclist / walker point-of-view a horrible narrow bit of the busy A371.
It links the residents of Westbury-sub-Mendip and Easton. Previously they would almost certainly have not bothered (or driven).
It involved a lot of expenditure including reinforcing the bridge under the A371 and building a new farm-access bridge.
Back to September tab ...